IN STOCK NOW

FAST SHIPPING

CANADA'S SOURCE FOR SIEGMUND

3YO Laser Cutting Cost Savings Calculator

Laser Cutting Machine table's dimensions

Material Cost for Laser Cutting Slats Replacement
(Excluding Time and Laser Cutting Cost for Production)

CURRENT CUSTOMER SITUATION

0.00
0.00
0.00

SITUATION WITH 3YOTS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00

Annual Material Savings for Producing Laser Cutting Slats per Machine Using 3YOTS

0.00 CAD

Annual Labor Cost for Slats Cleaning

CURRENT CUSTOMER SITUATION

0.00
0.00

SITUATION WITH 3YOTS

0
0
0.00
15.00
0.00
0.00
Total Annual Labor Cost Savings for Cleaning Laser Cutting Slats With Regular Use of 3YOTS:
0.00 CAD

Value of Additional Annual Laser Cutting Production

CURRENT CUSTOMER SITUATION

Monthly System Downtime Hours Due to Parts Sticking on the Laser Cutting Bed (When Loading and Unloading Automation Is Installed) -Typically night-time stops or unmanned working hours -

Monthly System Downtime Hours Due to Cleaning and Unplanned Maintenance Caused by Contamination Issues (e.g. flashbacks, not flat sheet and/or collisions, buildup, clogged conveyors, etc.)

0.00

SITUATION WITH 3YOTS

70.00

Monthly System Downtime Hours Due to Parts Sticking on the Laser Cutting Bed (When Loading and Unloading Automation Is Installed) - Typically night-time stops or unmanned working hours - with Regular Use of 3YOTS

0.00

Monthly System Downtime Hours Due to Cleaning and Unplanned Maintenance Caused by Contamination Issues (e.g., flashbacks, not flat sheet and/or collisions, buildup, clogged conveyors, etc.) with Regular Use of 3YOTS

0.00
0.00
Additional Annual Production Value (Based on 10 Working Months) with Regular Use of 3YOTS:
0.00 CAD

Cost Saving on Spare Parts for Electromechanical Slat Cleaning Systems

CURRENT CUSTOMER SITUATION

SITUATION WITH 3YOTS

100.00
Total Annual Spare Parts and Maintenance Cost Savings with 3YOTS:
0.00 CAD

Gross Total Annual Savings Summary

Total Annual Savings Using 3YOTS (Excluding Quality Improvements, Non-Conformity Reductions, and Injury Risk Mitigation):
0.00 CAD

3YOTS Operational Costs

0
0
0
0
0.00
0.00
0.00
Total Annual Cost With Regular Application of 3YOTS - per Type of Laser Cutting System listed in the table - Including Labor Cost:
0.00 CAD

Net Total Annual Savings Summary

Yearly Operational Cost Saving in Laser Cutting with 3YOTS (Excluding Quality Improvements, Non-Conformity Reductions, Injury Risk Mitigation etc...):
0.00 CAD

Return on Investment (ROI) Analysis

Note: The ongoing cost of 3YOTS product (reordered every 2-3 months) is already included in the annual operational costs above and factored into the net savings calculation.

ROI METRICS

ROI Percentage (Year 1)

0.00%

Payback Period (in months)

0.00

5-YEAR FINANCIAL IMPACT

Cumulative Savings After 5 Years (CAD)

0.00

Net Profit After 5 Years (After Investment) (CAD)

0.00

5-Year ROI Projection

Understanding the 5-Year ROI Projection

This chart visually demonstrates the financial impact of implementing 3YOTS in your laser cutting operations over a 5-year period:


Initial Implementation Cost: The one-time investment required to start using 3YOTS (equipment, training, setup).

Gross Cumulative Savings: The total financial benefits before deducting the ongoing 3YOTS product costs.

Net Cumulative Savings: The actual savings after accounting for the recurring 3YOTS product purchases (typically every 2-3 months).

Net Profit: The bottom-line financial gain after deducting both the initial implementation cost and the ongoing 3YOTS product costs.

Advanced Business Performance Metrics

The following metrics provide additional context for evaluating the impact of 3YOTS on operational efficiency and financial performance. Each metric represents a different perspective on value creation.

Cost per Cutting Hour (in CAD)
Operational cost per productive cutting hour
0%
CAD0.00 ACTUAL
WITH 3YOTS CAD0.00
Equipment Uptime
Productive machine availability
0%
0% ACTUAL
WITH 3YOTS 0%
First Year Cash Flow
Monthly net cash impact
Month 1 2 3 4 5 6
Cash Flow CAD0 CAD0 CAD0 CAD0 CAD0 CAD0
Month 7 8 9 10 11 12
Cash Flow CAD0 CAD0 CAD0 CAD0 CAD0 CAD0
Production Capacity Increase
Additional production volume potential
0%
0 Hours/Year ACTUAL
+ 0 Hours WITH 3YOTS
5-Year TCO Reduction
Total cost of ownership improvement
0%
CAD0 ACTUAL
WITH 3YOTS CAD0
Maintenance Time Reduction
Annual hours saved on maintenance
0
0 Hours/Year ACTUAL
0 Hours/Year WITH 3YOTS